| MARTINDALE-BRIGHTWOOD
NEIGHBORHOOD
COMBINED SEWER REHABILITATION, PHASE 2
INDIANAPOLIS, INDIANA
DPW PROJECT NO.: CS-18-053
The Combined Sewer Rehabilitation (Phase 2) for the Martindale-Brightwood
Neighborhood Area utilized the following methods:
•
Cured-in-place lining (CIPP;)
• Structural Repair (Point Repair) via excavation
and replacement; and
• Structural Repair using CIPP point liner.
The
project included 11,980 LF of Cured-in-place (CIPP) lining
ranging in size from 12 to 24 inches, 85 LF of structural
repair (point repair) via excavation and replacement, and
CIPP point liner for sewers ranging in size from 12 to 20
inches. Bypass pumping was performed during sewer rehabilitation
work to isolate sewer segments.
VS
ENGINEERING, INC. served as
the inspection consultant on this project for the City of
Indianapolis.
|