Structural Profile

MCFARLAND ROAD BRIDGE
BRIDGE REPLACEMENT
INDIANAPOLIS, INDIANA
DPW PROJECT NO.:BR-47-016 /INDOT PROJECT NO.:STP-B409


The McFarland Road bridge replacement over Little Buck Creek involved the replacement of the existing bridge structure on McFarland Road, 0.14 km (0.08 mi.) north of Southport Road. The total project length was 220 m (722 ft.)

The new bridge, a three span (9.75 m, 12.2 m, 9.75 m) continuous reinforced concrete slab bridge with integral end bents, was constructed on the same horizontal tangent alignment as the demolished structure and on a vertical alignment approximately 0.6 m (2 ft.) higher than the pre-existing gradient. The new bridge is on a 0 degree skew and has 9.0 m (30 ft.) clear roadway width. The project also included the reconstruction of the approaches incorporating two 3.3 m (11 ft.) lanes and 1.22 m (4 ft.) shoulders. Due to site constrictions, a 4-Bay Quadguard System and 1.2 m chain link fence were constructed at the northwest end of the new bridge structure.

As Prime consultant, VS ENGINEERING, INC. provided the following services:



 

• Project coordination and management
• Field survey and investigation
• Evaluation of existing information, including 100-year frequency discharge obtained from IDNR
• Hydraulic analysis of natural channel and floodplain and the existing and proposed structures
   using WSPRO computer model
• Review of backwater effects
• Analysis of various design alternatives and bridge structure types
• Preparation of Bridge Waterway Opening Sizing Study Report and Risk Assessment Report
• Coordination with various state and federal agencies, including IDNR for approval of the proposed
   bridge and permit for construction in a floodway
• Design of bridge structure, railing, sheet pilings, and modular retaining wall
• Preparation of environmental documents, contract plans, special provisions, and quantity and cost
   estimates.
  CLIENT/OWNER:

Department of Public Works
Mr. Long Nguyen
Project Manager
(317) 327-8427

INDOT
Mr. Bruno Canzian
LPA Project Manager
(317) 232-5319

 
  CONSTRUCTION COST: $650,000  
  PROJECT DATE: 2000  
 

 