Home About Us Why VS Engineering Services Available Contact VS Engineering Key Personnel

   
Transportation Profile

I-70 AND POST ROAD
INTERCHANGE MODIFICATION
INDIANAPOLIS, INDIANA
INDOT CONTRACT No.: R-23060


The interchange modification at I-70 and Post Road consisted of the complete removal of existing pavement of both eastbound and westbound lanes of the I-70 interchange from Post Road to I-70 (approximately 1.7 miles), reconstruction and widening of existing six (6) lanes to nine (9) lanes, removal and reconstruction of all ramps, modification of interchange geometry, construction of a new access loop, removal and replacement of all lighting and signing, construction of bridge abutments and wing walls, relocation of signal system, upgrading/reconstruction of drainage facilities, site restoration, and other incidental improvements.



Reconstruction of Lanes, Ramps, Bridge Abutment
and Addition of Lanes and loop

As a Prime Consultant, VS ENGINEERING, INC. provided the following services:


• Project coordination and management
• Field survey and investigation
• Design and preparation of right-of-way plans
• Geometric design of the urbanized arterial interchange
• Analysis and design of bridge abutment
• Design and layout of signing and lighting
• Modification and relocation of signal system
• Upgrade of the drainage system
• Maintenance of traffic scheme
• Preparation of contract plans, special provisions, quantities and cost estimates.

  CLIENT/OWNER:

INDOT
Mr. Donald Stratton
Project Manager, Design Section
(317) 232-6763

 
  CONSTRUCTION COST: $21,000,000.00 (Total)  
  PROJECT DATE: 1997-1998  
 

 